Building, Construction and Logging within Glen Cove
Prior to building, logging, or any site development a refundable deposit of $1000 is required to ensure that when your project is complete our roads are back to their pre-construction condition. Please contact our road supervisor, Pam at 253-857-5773 or email glencoveroad@gmail.com
Section 1. “Temporary Housing Unit Construction” may be
placed on the property for occupancy during a period of time
necessary to construct a permanent use or structure on the same
tract providing that:
a) A building permit for the permanent structure must be issued
by the county prior to moving temporary housing onto the
property. The building permit must be kept current.
b) A current mobile home license issued by the State of
Washington is maintained on the unit.
c) The mobile home is removed from the site within thirty (30)
days after final after final inspection of the project or within
one (1) year from the date the unit was first moved to the site,
whichever may first occur. In the event an annual extension is
needed, and the permit is kept current, an extension may be
granted for by the Board of Trustees upon a written request.
d) The mobility gear is not removed from the unit the unit is
not permanently affixed to the site on which it is located.
e) The mobile home is not located on any required front or side
yard.
f) A temporary permit is issued by the Building Department prior
to occupancy of the unit on the construction site.
g) These rules also apply to motor homes, trailers, R.V.s, and
etc. that is used as temporary housing. R.V.s cannot be used as
residences thirty days after the final inspection.
Section 2. Nor more than one (1) shall be built on each 1.25
acre lot.
Section 3. No modular homes shall be erected on any lot. Refer
to Declaration of Covenants #4 adopted June 25, 1977.
See Bylaws Article XVI: Restrictions [pdf]